Drop tube furnace emergency demolition
Large | Medium | Small | Print


In May 10, 2012 -6 month 4 days, over 20 Yu Tian, SGCG successfully completed the Shougang ironmaking plant of 3# blast furnace gas drop tube cracking of rescue work, danger.
In the narrow space, obstacle height more, near 100m, drop tube diameter φ 3.4m, length long 33.3m , weight long 120 tons are large, the inner wall of the tube has a thickness of about 50mm network and spray paint, there are always in dangerous situations, Shougang Construction Group through elaborate organization, careful refinement of demolition scheme, using 630t crawler crane and 400t crawler crane hook on time in two, successfully completed the drop tube is removed, by the unanimous praise of Shougang corporation.


oal gas Down pipe rescue Long emolition


oal gas Down pipe rescue Long emolition


oal gas Down pipe rescue Long emolition


oal gas Down pipe rescue Long emolition


oal gas Down pipe rescue Long emolition

Site Map   |   FAQ   |   Privacy Policy   
Copyright 2010 Beijing Shougang Construction Group Co., Ltd. All right reserverd.  
Add:No 15,Pingguoyuan Road,Shijingshan District,Beijing Fax:010-88294206 Zip:100041 Phone:010-88759998